Enhancement of object-related evaluation methods for construction management systems (BMS)
The project aimed at answering concrete questions concerning the thematic basics of the modules BMS-MV and BMS-MB which came up during the IT implementation process of the construction management system. First, the requirements regarding the thematic concepts and the definitions developed during the IT implementation process were stipulated systematically. In a next step, the questions were evaluated and integrated into the BMS processes. Then, appropriate solutions were developed, considering their feasibility. Solutions to all thematic problems were developed and presented in a final report. This report was then integrated as annex of the thematic concepts into the DV-refined concept of the construction management system.
Client
| Federal Highway Research Institute (BASt) 12/07 – 11/08 |
Contact: | Dr.-Ing. Andreas Stadler |
Role: | Project management |
More Information: |


